Skip to content

Rottnest Island Authority - Metering Code documents

Rottnest Island Authority has submitted a proposed metrology procedure to the ERA for approval. The metrology procedure provides guidance on the provision, installation and maintenance of metering equipment connected to the electricity network on Rottnest Island.

Papers

Page last updated: 23 Aug 2021