In 2010 the ERA agreed to Western Power’s request to waive the regulatory test for a proposed major augmentation to install a second 330/132 kV transformer at Kemerton Terminal, establish a 132 kV switchyard at Kemerton Terminal, and install approximately 10 km of 132 kV transmission line from Kemerton Terminal to the Binningup desalination plant.