Before committing to a major augmentation of its network, Western Power must satisfy the regulatory test. This means Western Power must demonstrate to the Economic Regulation Authority that it has considered all reasonable alternative options, including non-network solutions such as demand-side management or generation, and that its proposed option maximises the net benefit to those who generate, transport and consume energy in Western Power’s network.