Skip to content

Procedure Change EEPC_2024_02: Review of the Monitoring Protocol WEM Procedure

The Economic Regulation Authority (ERA) is responsible for compliance and enforcement functions in the Wholesale Electricity Market (WEM) in WA under chapter 2.13 of the WEM Rules.

ERA’s Monitoring Protocol WEM Procedure states the processes followed in ERA’s monitoring and compliance activities and is required by clause 2.15.1 of the WEM Rules.

On 8 August 2024 Energy Policy WA (EPWA) published the Exposure Draft for amending WEM Rules under FCESS Cost Review (Exposure Draft).

EPWA’s Exposure Draft proposes amendments to the Wholesale Electricity Market (WEM) Rules which will affect ERA’s monitoring and compliance functions.

Proposed changes to the Monitoring Protocol WEM Procedure include refining wording in some sections of the Monitoring Protocol and clarifying the risk assessment processes referred to in section 2.1, 4.5 and Appendix 1.

The ERA commenced the Procedure Change Process as specified in the WEM Rules (Chapter 2.10) to update the Monitoring Protocol.

On 5 September 2024, the ERA released the draft Monitoring Protocol WEM Procedure with a Procedure Change Proposal, detailing ERA’s proposed changes and the rationale behind them. The ERA sought stakeholder feedback by 3 October 2024. The ERA received two submissions.

On 29 October 2024, the Minister for Energy approved the WEM Amendment (FCESS Cost Review) Rules (Amending Rules).

On 4 November 2024, the ERA published a Procedure Change Report and Monitoring Protocol WEM Procedure (version 7). 

ERA Papers

Date  Documents File type
04-Nov-24 EEPC_2024_02 Procedure Change Report Monitoring Protocol Adobe PDF 306 kB
04-Nov-24 EEPC_2024_02 Monitoring Protocol (tracked changes) Adobe PDF 658 kB
04-Nov-24 EEPC_2024_02 Monitoring Protocol (clean version) Adobe PDF 622 kB
05-Sep-24 Procedure Change Proposal Monitoring Protocol Adobe PDF 256 kB
05-Sep-24 Monitoring Protocol WEM Procedure (tracked changes) Adobe PDF 658 kB
05-Sep-24 Monitoring Protocol WEM Procedure (clean version) Adobe PDF 619 kB

Public Submission

Date Documents File type
04-Nov-24 Alinta Energy Adobe PDF 184 kB
04-Nov-24 Synergy Adobe PDF 184 kB
Page last updated: 16 Dec 2024